OLYMPIC GAMES PROJECTS

April 4, 2018
April 4, 2018

OLYMPIC GAMES PROJECTS

CONTRACTOR: PAPADAKIS
ASSIGNED TASK: PLACEMENT OF A METAL ROOF AT THE TAE KWON DO VENUE PROJECT, PLACEMENT OF STANDS OF AN OUTDOOR SWIMMING POOL, PLACEMENT OF STANDS AT THE HEAVYWEIGHTS VENUE PROJECT IN LIOSIA, PLACEMENT OF MOUNTINGS FOR LIGHTS AT THE PERIMETER OF OAKA STADIUM.

CONTRACTOR: INTRAMET
PROJECT: PANTHESSALIKO STADIUM OF VOLOS
ASSIGNED TASK: TRANSPORT FROM LARISA TO THE FACILITIES OF INTRAMET OF THE PANTHESSALIKO STADIUM IN VOLOS AND ERECTION OF A SHELTER AND METAL STRUCTURES OF DIMENSIONS OF 6.5 METERS OF WIDTH AND 25 METERS OF LENGTH
TIME PERIOD: MAY 2004

CONTRACTOR: EFKLIDIS S.A. – METON S.A. JOINT VENTURE
PROJECT: CONSTRUCTION OF THE ATHENS-THESSALONIKI-EVZONI MOTORWAY, SECTION PASSING THROUGH THE URBAN ZONE OF KATERINI
ASSIGNED TASK: DISMANTLING AND LOADING OF METAL BEAMS
TIME PERIOD: JUNE 2004